Contenido multimedia no disponible por derechos de autor o por acceso restringido. Contacte con la institución para más información.
Section: ArticlesTitle: High airbone lead concentrations in a jobbing foundry / J. Ingle, D.C. Jones and J.J.W. SykesAuthor: Ingle, JohnNotes: Sumario: Approximately 1.5 tonnes of lead were melted in an oil-fired furnace. The furnace pot was emptied and then carefully scraped clean while still hot. The furnace was reused the following day for melting gunmental, when the high temperature required caused residual lead to vaporize. Lead fume concentrations were measured and found to be high throughout the foundry, Work practices were changed to avoid the reheating of pots contaminated by leadRelated records: En: The Annals of occupational hygiene. - Oxford [etc.]. - nº 1, 1988 ; p. 145-146Materia / lugar / evento: Higiene industrialContaminantes químicosContaminación atmosféricaControl de la contaminaciónHumos tóxicosFundiciónOtros autores: Jones, D.C. Sykes, J.J.W. Secondary titles: Título: The Annals of occupational hygiene Other categories: 872Rights: In Copyright (InC)