Interference between switched tasks
Contenido multimedia no disponible por derechos de autor o por acceso restringido. Contacte con la institución para más información.
Tag | 1 | 2 | Value |
---|---|---|---|
LDR | 00000nab a2200000 i 4500 | ||
001 | MAP20071019255 | ||
003 | MAP | ||
005 | 20080418115730.0 | ||
007 | hzruuu---uuuu | ||
008 | 940524e19920101gbr|||| | |00010|eng d | ||
035 | $a6800013073 | ||
040 | $aMAP$bspa | ||
084 | $a875 | ||
100 | 1 | $0MAPA20080240158$aCellier, Jean-Marie | |
245 | 1 | 0 | $aInterference between switched tasks$cJean-Marie Cellier and Hélène Eyrolle |
520 | $aInterference between tasks in a task-switching situation was interpreted in terms of theorical models of time-sharing. Controlled processing of two separate tasks in a time-sharing situation was hypothesized to require a strategy of management whose ease of execution depends on the complexity of the task involved. The types of error (intrusions, confusions and omissions) were considered to be specific to time-sharing | ||
650 | 1 | 1 | $0MAPA20080550653$aErgonomía |
650 | 1 | 1 | $0MAPA20080565626$aFactor humano |
650 | 1 | 1 | $0MAPA20080562250$aError humano |
650 | 1 | 1 | $0MAPA20080588397$aTiempos de trabajo |
650 | 1 | 1 | $0MAPA20080555061$aManagement |
650 | 1 | 1 | $0MAPA20080583514$aAnálisis de fallos |
650 | 1 | 1 | $0MAPA20080589844$aControl de procesos |
650 | 1 | 1 | $0MAPA20080603137$aProcesos industriales |
650 | 1 | 1 | $0MAPA20080606091$aEstrategia empresarial |
700 | 1 | $0MAPA20080130411$aEyrolle, Hélène | |
740 | 0 | $aErgonomics | |
773 | 0 | $tErgonomics$dLondon and Washington$gVol. 35, nº 1, January 1992 ; p. 25-36 |