Macroergonomic anticipatory evaluation of work organization in production systems
Contenido multimedia no disponible por derechos de autor o por acceso restringido. Contacte con la institución para más información.
Tag | 1 | 2 | Value |
---|---|---|---|
LDR | 00000nab a2200000 i 4500 | ||
001 | MAP20071025113 | ||
003 | MAP | ||
005 | 20080418121135.0 | ||
007 | hzruuu---uuuu | ||
008 | 960617e19950801gbr|||| | |00010|eng d | ||
040 | $aMAP$bspa | ||
084 | $a875 | ||
100 | 1 | $0MAPA20080106584$aLuczak, Holger | |
245 | 1 | 0 | $aMacroergonomic anticipatory evaluation of work organization in production systems$cHolger Luczak |
520 | $aThe problem of anticipation is structured in a hierarchical scheme of predictive and simulative approaches in work science. For the anticipatory evaluation of work organization sets of dependent and independent variables are connected in analytical and simulative models for control centres and design departments, in procedural and participative approaches to group work in the automotive industry, and in programmatical design concepts for direct manufacturing and assembly departments and for indirect functions in operations planning and scheduling | ||
650 | 1 | 1 | $0MAPA20080550653$aErgonomía |
650 | 1 | 1 | $0MAPA20080584771$aDiseño de sistemas |
650 | 1 | 1 | $0MAPA20080584788$aDiseño del trabajo |
650 | 1 | 1 | $0MAPA20080614805$aOrganización del trabajo |
650 | 1 | 1 | $0MAPA20080608675$aSistemas de producción |
740 | 0 | $aErgonomics | |
773 | 0 | $tErgonomics$dLondon and Washington$gVol. 38, nº 8, August 1995 ; p. 1571-1599 |