Búsqueda

Breach of contract

<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd">
  <record>
    <leader>00000nab a2200000 i 4500</leader>
    <controlfield tag="001">MAP20071504725</controlfield>
    <controlfield tag="003">MAP</controlfield>
    <controlfield tag="005">20080418124345.0</controlfield>
    <controlfield tag="007">hzruuu---uuuu</controlfield>
    <controlfield tag="008">040121e20031201gbr||||    | |00010|eng d</controlfield>
    <datafield tag="040" ind1=" " ind2=" ">
      <subfield code="a">MAP</subfield>
      <subfield code="b">spa</subfield>
    </datafield>
    <datafield tag="084" ind1=" " ind2=" ">
      <subfield code="a">7</subfield>
    </datafield>
    <datafield tag="100" ind1="1" ind2=" ">
      <subfield code="0">MAPA20080212551</subfield>
      <subfield code="a">Beale, Christopher</subfield>
    </datafield>
    <datafield tag="245" ind1="1" ind2="0">
      <subfield code="a">Breach of contract</subfield>
      <subfield code="c">Christopher Beale</subfield>
    </datafield>
    <datafield tag="520" ind1="8" ind2=" ">
      <subfield code="a">Chistopher Beale outline the factor influencing the safe management of contractors on major hazard installations. Contractors are increasingly being used at chemical plants and other major hazard installations to perform a range of critical role</subfield>
    </datafield>
    <datafield tag="650" ind1="1" ind2="1">
      <subfield code="0">MAPA20080618322</subfield>
      <subfield code="a">Safety Management Systems</subfield>
    </datafield>
    <datafield tag="650" ind1="1" ind2="1">
      <subfield code="0">MAPA20080623104</subfield>
      <subfield code="a">Grandes riesgos industriales</subfield>
    </datafield>
    <datafield tag="650" ind1="1" ind2="1">
      <subfield code="0">MAPA20080566012</subfield>
      <subfield code="a">Instalaciones</subfield>
    </datafield>
    <datafield tag="650" ind1="1" ind2="1">
      <subfield code="0">MAPA20080561918</subfield>
      <subfield code="a">Contratistas</subfield>
    </datafield>
    <datafield tag="650" ind1="1" ind2="1">
      <subfield code="0">MAPA20080550264</subfield>
      <subfield code="a">Contratas</subfield>
    </datafield>
    <datafield tag="650" ind1="0" ind2="1">
      <subfield code="0">MAPA20080588953</subfield>
      <subfield code="a">Análisis de riesgos</subfield>
    </datafield>
    <datafield tag="773" ind1="0" ind2=" ">
      <subfield code="w">MAP20077000260</subfield>
      <subfield code="t">Fire prevention</subfield>
      <subfield code="d">London</subfield>
      <subfield code="g">December 2003 ; p. 11-14</subfield>
    </datafield>
  </record>
</collection>