Search

Guide to applying reliability based decision making to ITM frequency for fire protection systems and equipment

<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd">
  <record>
    <leader>00000cam a22000004b 4500</leader>
    <controlfield tag="001">MAP20130002965</controlfield>
    <controlfield tag="003">MAP</controlfield>
    <controlfield tag="005">20130131125852.0</controlfield>
    <controlfield tag="008">130131s2012    usa||||       ||| ||eng d</controlfield>
    <datafield tag="040" ind1=" " ind2=" ">
      <subfield code="a">MAP</subfield>
      <subfield code="b">spa</subfield>
      <subfield code="d">MAP</subfield>
    </datafield>
    <datafield tag="084" ind1=" " ind2=" ">
      <subfield code="a">813</subfield>
    </datafield>
    <datafield tag="245" ind1="0" ind2="0">
      <subfield code="a">Guide to applying reliability based decision making to ITM frequency for fire protection systems and equipment</subfield>
      <subfield code="c">prepared by Lonny Simonian... [et al.]</subfield>
    </datafield>
    <datafield tag="260" ind1=" " ind2=" ">
      <subfield code="a">Quincy</subfield>
      <subfield code="b">The Fire Protection Research Foundation</subfield>
      <subfield code="c">2012</subfield>
    </datafield>
    <datafield tag="520" ind1=" " ind2=" ">
      <subfield code="a">Risk can be defined as the product of the likelihood of a failure and its consequences. Reliability based inspection (RBI) is intended to be a simple, logical, repeatable, documented method of determining equipment inspection frequencies and inspection scopes/methods and can be an effective tool for developing an efficient equipment inspection program, optimizing inspection frequencies and scope. Within the context of this report, reliability may be defined as the ability of an item to perform a required function under stated conditions for a  stated period of time; the stated conditions and stated period of time are important qualifiers. RBI is a method for using risk as a basis for prioritizing and managing the efforts of an Inspection Management Program</subfield>
    </datafield>
    <datafield tag="650" ind1=" " ind2="1">
      <subfield code="0">MAPA20080620424</subfield>
      <subfield code="a">Seguridad contra incendios</subfield>
    </datafield>
    <datafield tag="650" ind1=" " ind2="1">
      <subfield code="0">MAPA20080632748</subfield>
      <subfield code="a">Equipos de protección contra incendios</subfield>
    </datafield>
    <datafield tag="650" ind1=" " ind2="1">
      <subfield code="0">MAPA20080611125</subfield>
      <subfield code="a">Inspección de incendios</subfield>
    </datafield>
    <datafield tag="650" ind1=" " ind2="1">
      <subfield code="0">MAPA20080566326</subfield>
      <subfield code="a">Mantenimiento</subfield>
    </datafield>
    <datafield tag="650" ind1=" " ind2="1">
      <subfield code="0">MAPA20080602574</subfield>
      <subfield code="a">Métodos de evaluación</subfield>
    </datafield>
    <datafield tag="700" ind1="1" ind2=" ">
      <subfield code="0">MAPA20130001326</subfield>
      <subfield code="a">Simonian, Lonny</subfield>
    </datafield>
    <datafield tag="710" ind1="2" ind2=" ">
      <subfield code="0">MAPA20100050293</subfield>
      <subfield code="a">Fire Protection Research Foundation</subfield>
    </datafield>
  </record>
</collection>