Contenido multimedia no disponible por derechos de autor o por acceso restringido. Contacte con la institución para más información.
Sección: Documentos electrónicos Título: Grid readiness for HDV charging a survey among European DSOsPublicación: Brussels : Transport and Environment, 2023Descripción física: 37 p.Notas: Sumario: The regulation on the deployment of alternative fuels infrastructure (AFIR) obliges member states to ensure the deployment of recharging pools dedi cated to heavy-duty vehicles along the TEN-T core network and specifies maximum distances between and minimum capacities for these recharging pools for the target years 2025, 2027 and 2030. The targets as have been challenged by several member states. Raised questions address the suitability of existing electricity (distribution) networks to support the intended development, required actions to make network con nections available and the periods required for these changes. The objective of this assessment is to evaluate the technical feasibility of the charging infrastructure for heavy-duty vehicles in the perspective of the AFIR targets for a selected subset of EU member states. The analysis is restricted to member states with a perceived more challenging starting position and will focus on short term challenges (2025 to about 2027)Ámbito geográfico: EuropeoMateria / lugar / evento: Combustibles renovablesEnergíaElectricidadPuntos de recarga de electricidadVehículos eléctricosEnergía eléctricaInfraestructurasCamionesEuropaOtros autores: Transport and Environment RE-xpertise ef.Ruhr GmbH Otras clasificaciones: 892.6Derechos: In Copyright (InC)Referencias externas: