Búsqueda

A Stochastic Control Approach to Defined Contribution Plan Decumulation : "The Nastiest, Hardest Problem in Finance"

<?xml version="1.0" encoding="UTF-8"?><modsCollection xmlns="http://www.loc.gov/mods/v3" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-8.xsd">
<mods version="3.8">
<titleInfo>
<title>A Stochastic Control Approach to Defined Contribution Plan Decumulation</title>
<subTitle>: "The Nastiest, Hardest Problem in Finance"</subTitle>
</titleInfo>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">periodical</genre>
<originInfo>
<place>
<placeTerm type="code" authority="marccountry">esp</placeTerm>
</place>
<dateIssued encoding="marc">2022</dateIssued>
<issuance>serial</issuance>
</originInfo>
<language>
<languageTerm type="code" authority="iso639-2b">spa</languageTerm>
</language>
<physicalDescription>
<form authority="marcform">print</form>
</physicalDescription>
<abstract displayLabel="Summary">We pose the decumulation strategy for a defined contribution (DC) pension plan as a problem in optimal stochastic control. The controls are the withdrawal amounts and the asset allocation strategy. We impose maximum and minimum constraints on the withdrawal amounts, and impose no-shorting no-leverage constraints on the asset allocation strategy. Our objective function measures reward as the expected total withdrawals over the decumulation horizon, and risk is measured by expected shortfall (ES) at the end of the decumulation period. We solve the stochastic control problem numerically, based on a parametric model of market stochastic processes. We find that, compared to a fixed constant withdrawal strategy, with minimum withdrawal set to the constant withdrawal amount the optimal strategy has a significantly higher expected average withdrawal, at the cost of a very small increase in ES risk. Tests on bootstrapped resampled historical market data indicate that this strategy is robust to parametric model misspecification.

</abstract>
<note type="statement of responsibility">Peter A. Forsyth</note>
<subject xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="MAPA20080586447">
<topic>Modelo estocástico</topic>
</subject>
<subject xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="MAPA20080579258">
<topic>Cálculo actuarial</topic>
</subject>
<subject xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="MAPA20080554927">
<topic>Jubilación</topic>
</subject>
<classification authority="">6</classification>
<relatedItem type="host">
<titleInfo>
<title>North American actuarial journal</title>
</titleInfo>
<originInfo>
<publisher>Schaumburg : Society of Actuaries, 1997-</publisher>
</originInfo>
<identifier type="issn">1092-0277</identifier>
<identifier type="local">MAP20077000239</identifier>
<part>
<text>13/06/2022 Tomo 26 Número 2 - 2022 , p. 227-251</text>
</part>
</relatedItem>
<recordInfo>
<recordContentSource authority="marcorg">MAP</recordContentSource>
<recordCreationDate encoding="marc">220613</recordCreationDate>
<recordChangeDate encoding="iso8601">20220613143758.0</recordChangeDate>
<recordIdentifier source="MAP">MAP20220017596</recordIdentifier>
<languageOfCataloging>
<languageTerm type="code" authority="iso639-2b">spa</languageTerm>
</languageOfCataloging>
</recordInfo>
</mods>
</modsCollection>